I moved from ERCOT to MISO/Entergy (still in Texas) and my electricity costs have dropped by nearly 50%.
The part that is really shocking to me is the cost to maintain transmission infrastructure is dramatically higher in this area too (power lines in the forest).
I think it's hard to compete with a certain combination of fuel mix and fully amortized 20th century plants.
The part that is really shocking to me is the cost to maintain transmission infrastructure is dramatically higher in this area too (power lines in the forest).
I think it's hard to compete with a certain combination of fuel mix and fully amortized 20th century plants.