https://en.m.wikipedia.org/wiki/Initial_operating_capability
> "In general, attained when some units and/or organizations in the force structure scheduled to receive a system have received it and have the ability to employ and maintain it."
Contrast with these quotes from [1]:
> I have long defined minimum viable product as the smallest possible product that has three critical characteristics: people choose to use it or buy it; people can figure out how to use it; and we can deliver it when we need it with the resources available – also known as valuable, usable and feasible.
> I love the concept popularized by Eric Ries of the smallest possible experiment to test a specific hypothesis, but I refer to that that as an “MVP Test” so that people don’t confuse an experiment with a product.
Immediate or cancel?